Change Order Template

Enter the original contract and any earlier changes, then list each change as added work or a credit. The change order totals the additions and credits, shows the net change and the revised contract total, notes the extra days and leaves a line for the client to sign. Here the net change is $2,950.00.

Updated · Sources re-checked by

The change

Items

Additions$3,550.00
Credits$600.00
Net change$2,950.00
Revised contract$56,150.00
Document
Your business
Logo (optional)

Saved only in this browser, on this device. Not sent anywhere.

Client
Payment instructions and notes
Signature
Draw above.

Your signature is saved on this device only if you tick "Remember my business details".

Totals
Additions$0.00
Net change$0.00

$0.00 net change to the contract

Nothing you type is uploaded. The PDF is made in your browser, with no watermark. This is a template for your records, not tax or legal advice.

How the change order works

Additions = the sum of items that add to the contract. Credits = the sum of items that remove work. Net change = additions − credits, which can be negative. Revised contract total = original contract + earlier approved changes + this net change. Schedule change = days added. A change order does not ask for payment by itself: the money is billed later on a progress or final invoice at the revised price.

Revised contract total, step by step (example)
LineAmount
Original contract$50,000.00
Earlier approved changes$3,200.00
This change order, net$2,950.00
Revised contract total$56,150.00
What every change order should state
PartWhy it matters
What changes, in plain wordsSo the client can see exactly what they are approving
Price effect, added or creditedShows the cost before any work starts
Revised contract totalKeeps a running total across several changes
Schedule effect in daysExtra work often moves the finish date
Signatures and dateProof that both sides agreed before the work began

Worked example: a $50,000 contract with two additions and one credit

  1. Additions: electrical $1,150.00 + tile floor $2,400.00 = $3,550.00.
  2. Credit: garage door opener removed, $600.00.
  3. Net change: $3,550.00 − $600.00 = $2,950.00.
  4. Revised contract total: $50,000.00 + $3,200.00 earlier changes + $2,950.00 = $56,150.00.
  5. Schedule: 4 days added to the finish date.

Common questions

What is a change order?

A signed record that changes the original contract, usually its price, its schedule or both. It lists what changed, what it costs and the new totals.

When do I need a change order?

Any time the work differs from the contract: extra work, removed work, new materials or a different finish date. Get it signed before the extra work starts.

How do I handle a credit?

Add an item and choose Credit. It subtracts from the net change, and if the credits are bigger than the additions the net change shows as a negative number.

Does a change order replace the contract?

No. It amends it. The notes say that all other terms stay the same, and each change order builds on the revised total of the one before.

Should the client sign it?

Yes, and date it. The signature line is ticked on this page. A signed change order helps avoid disputes about price and time later.

Is a change order an invoice?

No. It approves a change. You bill the extra work later on a progress or final invoice at the revised contract price.

How is sales tax handled on a change order?

Tick Charge tax on the items that are taxable where you work, usually materials, and enter the rate. Tax is added to taxed additions and taken back on taxed credits. The revised contract total stays before the tax on this change, so it compares with the original amount. Check your local rules for what is taxable.

More invoice tools

  • Invoice Generator: Free invoice maker: items, tax, discount, deposit and balance due, with a clean PDF and no watermark.
  • Contractor Invoice Template: Contractor invoice with job site, license number, labor, materials, deposit and balance due, as a clean PDF.
  • Construction Invoice Template: Construction invoice for progress billing with project details, retainage held back and payments received.
  • Freelance Invoice Template: Freelance invoice by the hour or a fixed fee, with expenses, an advance already paid and your currency.
  • Blank Invoice Template: A blank invoice to print and fill in by hand, or fill online and let the totals work themselves out.
  • Simple Invoice Template: A plain invoice in about a minute: your name, the client, items and one tax rate, as a clean PDF.
  • Service Invoice Template: Service invoice with the service date and place, parts and fees, tax and payments, as a clean PDF.
  • Trucking Invoice Template: Trucking invoice with a load sheet: route, miles, rate per mile, fuel surcharge and detention, as a PDF.
  • Towing Invoice Template: Towing invoice built call by call: vehicle, call-out, extra miles, after-hours surcharge and storage days.
  • Moving Company Invoice Template: Moving invoice that starts with a crew calculator: movers, hours, minimum hours, truck fee, boxes and stairs.
  • Auto Repair Invoice Template: Auto repair invoice with a vehicle card, a parts table with part numbers, a labor table in hours and shop supplies.
  • Roofing Invoice Template: Roofing invoice that measures first: footprint and pitch give squares, then install, tear-off and flashing are priced.
  • Painter Invoice Template: Painting invoice built room by room: walls, ceilings, coats, gallons of paint and a price per square foot.
  • Cleaning Service Invoice Template: Cleaning invoice priced by home size and add-on tasks, with a schedule that sets the repeat-visit discount.
  • Free Estimate Template: Free estimate template with items, a contingency, a likely range around the total, a validity period and an acceptance signature.
  • Quote Template Generator: Quote generator with a fixed price, tax, a payment schedule that adds up exactly, a validity period and an acceptance signature.
  • Work Order Template: Work order template with priority, site, assignee, a task checklist, labor and materials, and a customer sign-off.
  • Receipt Template Generator: Receipt generator with the payment method, date paid, amount received and balance remaining, as a clean PDF.
  • Deposit Invoice Template: Deposit invoice that starts from the contract total: a percent or a fixed deposit, what was received and what is still due.
  • Progress Invoice Template: Progress invoice built from a schedule of values: percent done before and this period, and what is billed now.
  • Landscaping and Lawn Care Invoice Template: Landscaping and lawn care invoice from a service menu priced per visit, with a period total and a season total.
  • Free Invoice Template: Free invoice template: set your details and download Word or Excel, opens in Google Docs and Sheets too.
  • Invoice Template for Word: Free Word invoice template (.docx): choose rows, tax and extras, then edit every word in Word.
  • Invoice Template for Excel: Free Excel invoice template (.xlsx) with formulas for amounts, tax, total and balance due.
  • Invoice Template for Google Docs: Use the free invoice template in Google Docs or Google Sheets: download, upload to Drive, open and edit.
  • Timesheet Template: Free weekly or two-week timesheet (Excel with formulas, printable Word) with overtime and pay.

More calculators

  • Concrete Calculator: Cubic yards, cubic meters and 40, 50, 60 and 80 lb bags for slabs and round columns, with waste.
  • Concrete Slab Calculator: Concrete, bags and gravel base for one slab, with thickness presets and common size tables.
  • Concrete Bag Calculator: How many 40, 50, 60 or 80 lb bags for a slab or fence posts, with total weight.
  • Cubic Yard Calculator: Cubic yards for soil, mulch, gravel and more: several shapes, conversions, loads and bags.
  • Gravel Calculator: Cubic yards and tons of gravel for driveways, paths and bases, with layers, loads and cost.
  • Stair Calculator: Number of steps, exact riser, tread run, angle and slope length from the total rise, with a code check.
  • Stair Stringer Calculator: Stair stringer layout: framing square numbers, bottom cut, throat depth, board length and stringer count.
  • Roof Pitch Calculator: Convert rise over 12, degrees and percent slope, and get slope factor, rafter length and ridge height.
  • Board Foot Calculator: Board feet for several boards at once, with quarter notation, cost, cubic feet and cubic meters.
  • Paver Calculator: Number of pavers, pallets, gravel base, bedding sand and edge restraint for a patio, path or driveway.
  • Square Footage Calculator: Add rooms and shapes in feet, inches or meters, subtract cutouts, and see sq ft, sq yd, m² and acres.
  • Paint Calculator: Gallons of paint room by room: walls, doors, windows, ceiling and coats, with the amount to buy.
  • Paint Calculator by Square Feet: Gallons of paint from a square footage: coats, coverage, waste, quarts to buy and cost per square foot.
  • Mulch Calculator: Cubic yards for delivery and bags from the store for several beds, with a cost for each way.
  • Drywall Calculator: Sheets of drywall, boxes of joint compound and screws for rooms with doors, windows and ceilings.
  • Markup Calculator: Markup vs margin: enter a cost and a markup, a margin or a price, and see the other two and the profit.
  • Profit Margin Calculator: Gross and net profit and margin for a job or a month, and the price that reaches a target margin.
  • Contractor Hourly Rate Calculator: The hourly rate to charge from your wanted pay, tax estimate, overhead, profit cushion and billable hours.
  • Labor Cost Calculator: True labor cost for a crew: wages, overtime and burden, the cost per hour and a bill-out price.
  • Fence Calculator: Posts, panels or pickets and rails, post length and bags of concrete for runs of fence with gates.
  • Roofing Calculator: Roof sections with pitch to squares, shingle bundles with waste, underlayment rolls, drip edge and cost.
  • Roof Square Calculator: Square feet to roofing squares from an area, a flat plane or a footprint with pitch, with bundles and a price.
  • Wallpaper Calculator: Wallpaper rolls by the drop method: strips per wall, pattern repeat, strips per roll and rolls to order.
  • Insulation Calculator: Depth for a target R-value from the R per inch on your label, with volume, existing layer and packages.
  • Plywood Calculator: Sheets of plywood for floors, walls and roofs from areas with openings taken away, by sheet size, with cost.
  • Team Payroll Calculator: Employer cost of a team of 10 to 50 workers: hourly and salaried, overtime, burden, cost per period and per year.
  • Overtime Calculator: Overtime pay at 1.5x or your own multiplier, double time, and the effective hourly rate.
  • Hourly to Salary Calculator: Hourly rate to yearly, monthly, weekly and daily pay, and salary back to hourly, with unpaid weeks.
  • Feet and Inches Calculator: Add, subtract, multiply and divide lengths in feet and inches, find how many pieces fit, and total a list of measurements.

This tool makes a document for your records and your clients. It is not tax or legal advice and it does not create an official e-invoice for any tax authority. Check the rules where you work.